01How long does a renovation consent take?+
Council has statutory processing timeframes, but requests for further information can extend them. We focus on complete, coordinated documentation to reduce avoidable delays.
02Do all renovations require consent?+
No. Cosmetic work may be exempt, while structural, plumbing, weathertightness and fire-safety work commonly requires consent. We can review your scope before you commit.
03Can you prepare plans from an existing house?+
Yes. We can measure and document your existing home, then use that accurate base to develop the renovation design.
04Can you redesign our floor plan?+
Yes. Improving circulation, natural light, storage and family living is central to our renovation design work.
05Can you work with our builder?+
Absolutely. We prepare practical documentation and can coordinate with your chosen builder throughout the pre-construction phase.
06Can you recommend a builder?+
Yes. When you need one, we can introduce our trusted building partner, Neda Builda.
07Do you manage engineers?+
Yes. We coordinate structural engineers and other specialist consultants required for your documentation.
08Can you estimate construction costs?+
We can support early cost planning and help test design decisions against your budget before the drawings are finalised.
09Can you help remove load-bearing walls?+
Yes. We design the revised layout and coordinate the structural engineering needed for consent.
10Can council reject renovation plans?+
Council may request changes or further information when requirements are not met. Thorough documentation and early coordination materially reduce that risk.